• JSA template · ground-floor interiors
Painting JSA template Australia
Ground-floor interior painting from a platform under 2 metres is not high-risk construction work. A Job Safety Analysis is the right written assessment — solvents, dust, other trades, not a fall from the eave. The moment this job becomes first-floor eaves or a roof, stop using a JSA as the legal document.
When a painting JSA is enough
Not HRCW: ground-floor walls and ceilings from a platform under 2 m. Hazards are real — silica from compound, solvent enamel, other trades — they just aren’t Schedule 3 by themselves.
This is not the occupied Hawthorn terrace on the filled JSA example page. That job has possible lead on original plaster. This one is a new townhouse in Coomera, still curing compound, tilers in the wet areas next door.
First-floor eaves, a void, or a roof: working at heights SWMS. A JSA is not a legal substitute.
Filled example: new-build interiors, Coomera QLD
Open-plan living and hallway, ground floor only. First coat on new plasterboard. Water-based walls, no solvent enamel on this visit. Platform under 2 m. Other trades still in the dwelling.
Example layout — not a copy-paste legal document. Occupied lead terraces are a different JSA (see the Hawthorn blog example). Eaves over 2 m need a heights SWMS, not this JSA.
| Step | Hazards | Controls | 5×5 risk |
|---|---|---|---|
1. Sign in with the builder, mask new plaster, keep a clear path for other trades Responsible: Leading hand |
|
| InitialL3×C3 = 9 Medium ResidualL2×C2 = 4 Low |
2. Spot-fill and sand walls and ceiling from the floor and a platform under 2 m Responsible: Painter |
|
| InitialL4×C3 = 12 High ResidualL2×C3 = 6 Medium |
3. Cut in ceilings and corners, then roll walls (water-based) Responsible: Painter |
|
| InitialL3×C3 = 9 Medium ResidualL2×C2 = 4 Low |
4. Clear the rooms for the tiler tomorrow; wash up water-based gear Responsible: All workers |
|
| InitialL3×C2 = 6 Medium ResidualL1×C2 = 2 Low |
Frequently asked questions
Do I need a painting JSA template in Australia?
For ground-floor interiors under 2 m, a JSA is the usual written risk assessment principals ask for. It is not legally prescribed the way a SWMS is. First-floor eaves, a stair void, or any fall greater than 2 m needs a SWMS instead.
Is there a free painting JSA download?
Generate in the trial and download the PDF, no card. This Coomera new-build example is a layout. Don’t sign it for a lead terrace in Melbourne.
Do painters need a SWMS or a JSA?
Under 2 m on the ground floor: JSA. Fall greater than 2 m (eaves, voids, roofs): SWMS. A JSA is not a legal substitute on high-risk construction work.
Is this JSA valid in NSW, VIC, QLD and WA?
You can generate for each state. NSW, QLD and WA cite the WHS Act/Regulation. Victoria cites the Occupational Health and Safety Act 2004 and Occupational Health and Safety Regulations 2017. There is still no prescribed JSA format — the state line is for honest citations, not a magic stamp.
How is this different from the Hawthorn painting example?
The blog JSA example is an occupied Victorian terrace in Hawthorn with possible lead. This page is a new-build townhouse in Coomera — plaster dust, other trades, water-based coatings, no lead story. Same trade, different job.
Generate a painting JSA for this interior
Rooms, coatings and the state. Free trial, no credit card. Not a SWMS for eaves.