• JSA template · ground-floor cabinets
Joinery JSA template Australia
Ground-floor cabinet install is usually a JSA job: manual handling, cutting dust, drilling into walls. It is not a SWMS unless you hit high-risk construction work — a fall greater than 2 m, live electrical, asbestos in the wall. This page is a laundry and butler’s pantry in Geelong, not the Penrith kitchen already filled out on the JSA template.
Why this is not the Penrith kitchen
The JSA template page already has a filled kitchen install in Penrith NSW — timber studs, driveway unload, track saw in the yard. This page is a laundry and butler’s pantry in a new duplex in Geelong: masonry walls, a slope to the street, a trough already set, waterproofing you must not drill through.
Still not HRCW if you stay on the ground floor under 2 m and you don’t chase live services. If the wall hides a live cable you cannot confirm, stop and treat it as electrical HRCW or get it isolated.
Filled example: laundry and pantry, Geelong VIC
Ground-floor duplex. Tall pantry, laundry cabinets, and a laminate bench over an existing trough. Hammer-drill into brick. Victorian OHS citations on the live document when you pick VIC.
Example layout. Different site and task from the Penrith kitchen on the JSA template page. Live services in the wall, or a fall over 2 m: stop — that is not this JSA. Victoria: OHS Act 2004 / OHS Regulations 2017.
| Step | Hazards | Controls | 5×5 risk |
|---|---|---|---|
1. Confirm setout against the waterproofing certificate and the trough Responsible: Leading hand |
|
| InitialL3×C3 = 9 Medium ResidualL2×C2 = 4 Low |
2. Unload tall pantry and laundry units from a sloping street Responsible: All workers |
|
| InitialL4×C3 = 12 High ResidualL2×C3 = 6 Medium |
3. Scribe carcasses and cut filler next to the trough Responsible: Cabinet installer |
|
| InitialL4×C3 = 12 High ResidualL2×C3 = 6 Medium |
4. Fix to masonry, fit the bench, silicone to the splash Responsible: Leading hand |
|
| InitialL3×C4 = 12 High ResidualL2×C3 = 6 Medium |
Frequently asked questions
Do I need a joinery JSA template?
Principals often want a written JSA for cabinet install even when a SWMS is not legally required. Ground-floor laundry and pantry units are that job. Wall units over a void, or drilling next to a live board, can change the document.
Is the joinery JSA free?
Trial generate and PDF, no card. Don’t photocopy the Penrith kitchen example or this Geelong laundry onto a different floor plan.
SWMS or JSA for joinery?
Ground-floor, platform under 2 m, isolated services: JSA. Roof soffit, live electrical, ACM in the wall: SWMS for that part. A JSA is not a substitute on HRCW.
NSW, VIC, QLD, WA?
State-aware citations. Victoria uses the OHS Act 2004 and OHS Regulations 2017; the others use WHS. There is no prescribed JSA form in any of them.
Generate a joinery JSA for this cabinet install
Site, units and the state. Free trial, no credit card.
Start free trial →