What a good JSA looks like
A Job Safety Analysis breaks one job into the steps the crew will actually work, then for each step lists the hazards, the controls, who is responsible, and a risk score before and after those controls. If a step is missing, a hazard is generic (“be careful”), or nobody is named as responsible, it is not a useful JSA.
Expect to see:
- Job, site, suburb/state and PPE at the top
- Numbered steps in work sequence
- Hazards that belong to that step on that site — not a copied list
- Controls that follow the hierarchy (eliminate, substitute, isolate, engineer, administer, PPE last)
- A named responsible person per step
- A 5×5 initial and residual score (likelihood × consequence)
- A sign-on so the crew confirm they were consulted
5×5 line: likelihood (1–5) × consequence (1–5). Bands: Low 1–4, Medium 5–9, High 10–15, Critical 16–25. Residual risk should drop after controls. If it does not, the controls are not doing enough.
Filled JSA example: interior painting, Hawthorn VIC
Victorian terrace, ground floor only. Walls, ceiling and trim in the living room and hallway. Work from a platform under 2 metres — so this is not high-risk construction work. A different job (kitchen joinery, Penrith NSW) is filled out on the JSA template page; this sample is painting, on purpose.
This is a filled JSA example for a job that is not high-risk construction work. Roofing, rooftop solar, energised electrical, or any work with a risk of a fall greater than 2 metres still needs a SWMS. A JSA is not a legal substitute. See the HRCW checklist.
| Step | Hazards | Controls | 5×5 risk |
|---|---|---|---|
1. Sign on, walk the rooms, lay drop sheets and set up extraction Responsible: Leading hand |
|
| InitialL3×C3 = 9 Medium ResidualL2×C2 = 4 Low |
2. Prepare surfaces — scrape, fill and sand walls and trim Responsible: Painter |
|
| InitialL4×C3 = 12 High ResidualL2×C3 = 6 Medium |
3. Cut in ceilings, walls and corners from a platform under 2 m Responsible: Painter |
|
| InitialL3×C3 = 9 Medium ResidualL2×C2 = 4 Low |
4. Roll walls and paint trim (water-based walls, solvent enamel on doors) Responsible: Painter |
|
| InitialL3×C3 = 9 Medium ResidualL2×C2 = 4 Low |
5. Clean up, pack leftover paint and load the van Responsible: All workers |
|
| InitialL3×C2 = 6 Medium ResidualL1×C2 = 2 Low |
Notice the site-specific bits: occupied house, possible lead on a pre-1970s terrace, solvent enamel on trim, council drop-off for leftover thinners. A warehouse pick-face JSA or a ground-floor tiling JSA would look different. That is the point.
This is an example layout — not a copy-paste legal document
Do not take JSA-EX-PAINT-001 to a different house and sign it. The next job might have lead, or it might not. It might have a stair void, a dog, a live oven in the hallway, or a ceiling that forces you over 2 metres. Consult the crew before work starts, walk the rooms, and rewrite the steps that do not match.
If the crew did not help write it, and the address on the page is not the address you are standing in, it is not your JSA.
A JSA is not a legal substitute for a SWMS on HRCW
Under the model WHS Regulations, high-risk construction work in Schedule 3 (regulation 291) needs a Safe Work Method Statement before work starts. Painting from a platform under 2 m on the ground floor is not on that list. The moment this job becomes ceiling work from a height with a risk of a fall greater than 2 metres, or anyone is working on a roof, you stop using a JSA as the legal document and write a SWMS.
Same rule for:
- Roofing and rooftop solar
- Any task with a risk of a fall greater than 2 m
- Work near energised electrical installations
- The rest of the 18 HRCW categories
Victoria uses the Occupational Health and Safety Act 2004 and the Occupational Health and Safety Regulations 2017 (WorkSafe Victoria), not the model WHS Act. Other jurisdictions use model WHS. The practical line is the same: a JSA does not replace a SWMS on high-risk construction work. Full comparison: SWMS vs JSA.
What is a JSA example?
A JSA example (sometimes called a JSA sample or filled JSA) is a completed Job Safety Analysis you can read end to end. It should show job and site meta, PPE, numbered steps, hazards, controls, a responsible person, and 5×5 initial → residual scores. Blank templates are useful; a filled example is how you learn what “good” looks like. This page is that filled example. The JSA template is the form you generate from.
Can I copy this filled JSA?
You can copy the structure — steps, hazards, controls, scores. You cannot copy the content onto another site and call it consultation. WHS (and Victorian OHS) expects the people doing the work to be involved. If a principal asks for “your JSA” and you hand them this Hawthorn painting sample for a tiling job in Brisbane, that is the wrong document.
Fastest honest path: start a free trial (no card), describe your job, and generate a JSA you can edit with the crew.
JSA vs SWMS — which document is this?
This sample is a JSA. It is the right document for ground-floor interior painting that stays under 2 m. It is the wrong document for the same painter asked to coat a first-floor eaves from a roof. If you are unsure which one you need, read SWMS vs JSA — it works one Australian site both ways — and what a SWMS is.
Generate your own JSA
Use the JSA template to draft a site-specific Job Safety Analysis: steps, hazards, controls, 5×5 scores, responsible person and a sign-on register. Start free — no credit card. If the job is HRCW, switch to the SWMS template instead.
Generate your next SWMS in 3 minutes
AI-written. State-aware. Free trial — no card required.
Start free trial →