• SWMS template · erect, alter, dismantle
Scaffolding SWMS template Australia
Putting a scaffold up is not “access prep” you bury in someone else’s SWMS. Erect, alter and dismantle are their own high-risk sequence: falls from incomplete lifts, falling frames onto the footpath, and a tag that actually means the structure is ready.
When a scaffolding SWMS is the right document
HRCW: fall greater than 2 m, and often work where there are falling objects. Independent scaffold on a three-storey terrace is both. A hop-up inside a ground-floor room under 2 m is not this page.
The SWMS belongs to the scaffolder (the PCBU doing the erect/alter/dismantle), consulted with that crew. The builder’s roof SWMS does not replace it.
Filled example: independent scaffold, Paddington NSW
Three-storey brick terrace, narrow footpath, residents still using the front door. Facade pointing next week — this SWMS is the erect, a mid-job hop-up alter, and the dismantle. Not the pointing itself.
Example layout. Public protection on a Paddington footpath is part of the job, not an extra. Licensed scaffolders still need this SWMS. Heights work from the finished scaffold: working at heights SWMS.
| Step | Hazards | Controls | 5×5 risk |
|---|---|---|---|
1. Check ground bearing, underground services and overhead power before base-out Responsible: Supervisor |
|
| InitialL3×C4 = 12 High ResidualL2×C3 = 6 Medium |
2. Base out, build the first lift, fit ties and falling-object protection Responsible: Scaffolder |
|
| InitialL4×C5 = 20 Critical ResidualL2×C5 = 10 High |
3. Build upper lifts, hop-ups for the pointers, tag the scaffold Responsible: Leading hand |
|
| InitialL3×C5 = 15 High ResidualL2×C5 = 10 High |
4. Alter for a window bay, then dismantle in reverse at the end of the job Responsible: Scaffolder |
|
| InitialL3×C5 = 15 High ResidualL2×C5 = 10 High |
Frequently asked questions
Do I need a scaffolding SWMS template?
Yes when the work involves a risk of a fall greater than 2 m or falling objects onto workers or the public — which erecting and dismantling almost always does. High-risk licences still need a SWMS for the job, not just a ticket in the wallet.
Is there a free scaffolding SWMS download?
Generate one in the trial and download the PDF. No card. Don’t photocopy this Paddington example onto a tower scaffold in a warehouse.
Can the painter’s JSA cover the scaffold?
No. The crew who erect and dismantle need a SWMS for that work. The painter working from a completed, tagged scaffold on the ground-floor lift might be on a JSA — only if their fall is not greater than 2 m. First-floor pointing is still heights HRCW.
Is this valid in NSW, VIC, QLD and WA?
State-aware citations: WHS Act/Regulation in NSW, QLD, WA; OHS Act 2004 and OHS Regulations 2017 in Victoria. Scaffold high-risk work licences and the relevant code of practice still apply in each state.
Generate a scaffolding SWMS for this structure
Erect, alter, dismantle — and the street below. Free trial, no credit card.
Start free trial →