Knocking out a load-bearing wall is high-risk construction work whether the site is a tower or a brick shop in Newtown. Temporary support, falling masonry, and an asbestos check before strip-out are the job. A fit-out JSA does not cover the wall.
Load-bearing demolition is HRCW
HRCW: demolition of a load-bearing element, or an element related to structural integrity. Temporary propping is often a second category (temporary load-bearing support). One SWMS can cover both if it is honest about the sequence.
Asbestos: check the register and sample before strip-out. If it is ACM, this is no longer “just demo” — switch to the asbestos SWMS and a licensed removalist where the law requires it.
Filled example: load-bearing wall, Newtown NSW
Brick shop conversion. Knock through a load-bearing internal wall after needle beams and props. Occupied florist next door. Not a full building pull-down, not a ground-floor plaster soft strip.
Example layout. Asbestos check before the first bar. If ACM is confirmed, stop and use the asbestos SWMS — don’t keep this sequence going.
| Step | Hazards | Controls | 5×5 risk |
|---|---|---|---|
1. Read the asbestos register, sample if needed, and isolate the bay Responsible: Supervisor |
|
| InitialL3×C5 = 15 High ResidualL2×C5 = 10 High |
2. Install needle beams and props to the engineer’s sketch Responsible: Leading hand |
|
| InitialL3×C5 = 15 High ResidualL2×C5 = 10 High |
3. Cut and drop the masonry in controlled bites Responsible: Demolition worker |
|
| InitialL4×C5 = 20 Critical ResidualL2×C5 = 10 High |
4. Clean out, leave props until the lintel is in, then strip temporary works Responsible: Supervisor |
|
| InitialL3×C5 = 15 High ResidualL2×C5 = 10 High |
Frequently asked questions
When is a demolition SWMS template required?
When you demolish an element of a structure that is load-bearing or otherwise related to its physical integrity. That is HRCW. Soft strip of non-structural plaster on a ground floor might be a JSA — only if no ACM, no structural element, no other HRCW.
Is there a free demolition SWMS?
Trial generate and PDF, no card. Don’t take this Newtown shop example to a warehouse mezzanine and sign it.
What if we find asbestos during demolition?
Stop, isolate, don’t keep swinging. Planned ACM removal is a different SWMS (and usually a licensed job). Use the asbestos SWMS page, not this demolition sequence.
NSW, VIC, QLD, WA — same demolition SWMS?
The HRCW trigger is the same idea. Citations: WHS Act/Regulation, or Victoria’s OHS Act 2004 and OHS Regulations 2017. Local demolition licensing and notification rules still apply.