SWMS template · load-bearing demolition

Demolition SWMS template Australia

Knocking out a load-bearing wall is high-risk construction work whether the site is a tower or a brick shop in Newtown. Temporary support, falling masonry, and an asbestos check before strip-out are the job. A fit-out JSA does not cover the wall.

Generate a demolition SWMSSee live demo

Load-bearing demolition is HRCW

HRCW: demolition of a load-bearing element, or an element related to structural integrity. Temporary propping is often a second category (temporary load-bearing support). One SWMS can cover both if it is honest about the sequence.

Asbestos: check the register and sample before strip-out. If it is ACM, this is no longer “just demo” — switch to the asbestos SWMS and a licensed removalist where the law requires it.

Filled example: load-bearing wall, Newtown NSW

Brick shop conversion. Knock through a load-bearing internal wall after needle beams and props. Occupied florist next door. Not a full building pull-down, not a ground-floor plaster soft strip.

Job / task
Demolish load-bearing internal brick wall after temporary propping
Site
Brick shop conversion, Newtown NSW 2042
Document
SWMS · HRCW: structural demolition · example only
PPE
Hard hat, hi-vis, steel-caps, glasses, P2, gloves, hearing protection on the saw

Example layout. Asbestos check before the first bar. If ACM is confirmed, stop and use the asbestos SWMS — don’t keep this sequence going.

StepHazardsControls5×5 risk
1. Read the asbestos register, sample if needed, and isolate the bay
Responsible: Supervisor
  • Undocumented ACM in old mastic, vinyl, or cement sheet linings
  • Public on the footpath outside the shopfront
  • Services in the wall (power, gas)
  • No strip-out until the register / samples are clear; if ACM — stop and replan
  • Hoarding and tape; florist next door briefed
  • Isolate power and cap gas before the wall is touched; prove dead
InitialL3×C5 = 15 High
ResidualL2×C5 = 10 High
2. Install needle beams and props to the engineer’s sketch
Responsible: Leading hand
  • Partial collapse if props are undersized or on soft floors
  • Manual handling of steel needles in a narrow shop
  • Struck-by while packing plates
  • Engineer holds the sequence; don’t freestyle the props
  • Sole plates; two-person lifts; don’t stand under a needle being packed
  • Exclusion in the bay until the props are taking load
InitialL3×C5 = 15 High
ResidualL2×C5 = 10 High
3. Cut and drop the masonry in controlled bites
Responsible: Demolition worker
  • Uncontrolled collapse of the remaining pier
  • Silica dust and flying brick
  • Vibration affecting the florist’s party wall
  • Small bites; never undercut a pier that is still carrying
  • Wet down, P2, extraction; hearing protection; no dry chasing without controls
  • Stop if the party wall cracks; engineer back on site
InitialL4×C5 = 20 Critical
ResidualL2×C5 = 10 High
4. Clean out, leave props until the lintel is in, then strip temporary works
Responsible: Supervisor
  • Removing props too early
  • Trips on brick rubble
  • Manual handling of rubble to the skip
  • Props stay until the new lintel is bearing and the engineer signs off
  • Clear as you go; defined barrow path
  • Tubs, not overfilled barrows; spotter at the skip
InitialL3×C5 = 15 High
ResidualL2×C5 = 10 High

Frequently asked questions

When is a demolition SWMS template required?

When you demolish an element of a structure that is load-bearing or otherwise related to its physical integrity. That is HRCW. Soft strip of non-structural plaster on a ground floor might be a JSA — only if no ACM, no structural element, no other HRCW.

Is there a free demolition SWMS?

Trial generate and PDF, no card. Don’t take this Newtown shop example to a warehouse mezzanine and sign it.

What if we find asbestos during demolition?

Stop, isolate, don’t keep swinging. Planned ACM removal is a different SWMS (and usually a licensed job). Use the asbestos SWMS page, not this demolition sequence.

NSW, VIC, QLD, WA — same demolition SWMS?

The HRCW trigger is the same idea. Citations: WHS Act/Regulation, or Victoria’s OHS Act 2004 and OHS Regulations 2017. Local demolition licensing and notification rules still apply.